top of page

Advertise Here.

Read Full Story Here...
Formby School of Dancing & Perfoming Arts new banner.jpg

Roadwork update for today and tomorrow in Formby and Hightown


Roadworks about to start today or tomorrow in Formby and Hightown:

Harington Road, Formby, Sefton Council

07 September — 20 September

Delays likely Traffic control (Stop/Go boards)

Works location: Victoria Road To Wicks Lane

Works description: Surface Dressing

Responsibility for works: Sefton Council

Current status: Planned work about to start

North End Lane, Ince Blundell, Sefton Council

07 September — 20 September

Delays likely Road closure

Works location: A565 Formby Bypass To Moss Lane

Works description: Surface Dressing

Responsibility for works: Sefton Council

Current status: Planned work about to start

Victoria Road, Formby, Sefton Council

07 September — 20 September

Delays likely Traffic control (Stop/Go boards)

Works location: Golf Road To Tower End

Works description: Surface Dressing

Responsibility for works: Sefton Council

Current status: Planned work about to start

Thistledown Drive, Hightown, Sefton Council

08 September — 08 September

Delays possible Traffic control (two-way signals)

Works location: At The Railway Bridge - Kerslake Way Over Thistledown Drive Span

Works description: Structures Examination Of The Bridge (Hxs3/40a). 09:00 - 15:00

Responsibility for works: Network Rail Infrastructure Ltd

Current status: Planned work about to start

Southport Old Road, Formby, Sefton Council

08 September — 08 September

Delays unlikely No carriageway incursion

Works location: On The Grass Verge Approx. 5m From Junction For R/B For Southport Old Road And Formby Bypass

Works description: Trial Dig - Excavate Approx 1m Sq At Base Of Existing Tower To Confirm Suitability For Re-Use

Responsibility for works: T-Mobile (UK)Limited

Current status: Planned work about to start

Victoria Road, Formby, Sefton Council

07 September — 14 September

Delays unlikely Traffic control (priority working)

Works location: O/S And Opp 61

Works description: New Gas Service To Be Installed- Works In Footway And Cway...

Responsibility for works: E S Pipelines Ltd

Current status: Advanced planning

Roadworks Information provided by ELGIN www.elgin.org.uk. Roadworks Information Database Right copyright © ELGIN. Roadworks Information may contain NTCC Traffic Data copyright © Highways Agency. Roadworks Information may contain TfL Transport Data copyright © Transport for London. Roadworks Information may contain Ordnance Survey data and database rights © Crown copyright. Click here for further information on reuse and copyright of Roadworks Information.

10 views
Ryders Chemist Hearing Clinic.png
Logo.png
Square Advert 1.jpg
Large Square Advert.jpg
square with Hot Tub.jpg

Submit Your News to Formby Bubble

Contact us with your Community News, Business or Sports News. 

Phone our Newsdesk on: 01704 86 30 30 

Email info@formbybubble.com

Facebook www.facebook.com/formbybubble

Twitter  www.twitter.com/formbybubble

Instagram: www.instagram.com/formbybubblenews

 

Please submit your news story to info@formbybubble.com, the biggest news outlet for Formby with over 40,000 individual hits on our website every month and over 500,000 page views!

  • Instagram
  • Facebook App Icon
  • Twitter App Icon
Featured Stories
Banner with Hot Tub.jpg
bottom of page