Roadwork update for today and tomorrow in Formby and Hightown

Roadworks about to start today or tomorrow in Formby and Hightown:
A565 Formby Bypass, Formby, Sefton Council
18 July — 20 July
Delays likely Lane closure
Works location: Moor Lane - Liverpool Road
Works description: Grass Cutting
Responsibility for works: Sefton Council
Current status: Planned work about to start
A565 Formby Bypass, Formby, Sefton Council
19 July — 21 July
Delays likely Lane closure
Works location: Liverpool Road - Southport Road
Works description: Grass Cutting
Responsibility for works: Sefton Council
Current status: Planned work about to start
Alt Road, Formby, Sefton Council
18 July — 20 July
Delays possible Some carriageway incursion
Works location: At 52 Formby Sefton Council
Works description: '70mm (2x 35mm Layers)Of 10mm Ac Close Bs En13108-1 In Footway'
Responsibility for works: Sefton Council
Current status: Planned work about to start
B5424 Church Road, Formby, Sefton Council
18 July — 20 July
Delays possible Some carriageway incursion
Works location: Junction Of Cable St Formby Sefton Council
Works description: '70mm (2x 35mm Layers)Of 10mm Ac Close Bs En13108-1 In Footway'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Freshfield Road, Formby, Sefton Council
19 July — 28 July
Delays possible Some carriageway incursion
Works location: 47a
Works description: Excavate To Standard Depth, Open Cut In Footway For Jointbay And Tench To Lay Cable For Underground Electrical Service Connection. Followed By A Reinstatement.
Responsibility for works: SP Energy Networks
Current status: Planned work about to start
New Causeway, Ince Blundell, Sefton Council
19 July — 21 July
Delays possible Traffic control (two-way signals)
Works location: At Bend Ince Blundell Sefton Council
Works description: '100mm (2 Layers Of 50mm), 10mm Ac Close, Bs En13108-01 In Carriageway'151 Works Aborted Twice Due To Heavy Rain Causing Flooding.
Responsibility for works: Sefton Council
Current status: Planned work about to start
Victoria Road, Formby, Sefton Council
18 July — 20 July
Delays possible Some carriageway incursion
Works location: Opposite Lighting Column 15 Formby Sefton Council
Works description: '70mm (2x 35mm Layers)Of 10mm Ac Close Bs En13108-1 In Footway'
Responsibility for works: Sefton Council
Current status: Planned work about to start
St Peters Avenue, Formby, Sefton Council
18 July — 20 July
Delays unlikely Some carriageway incursion
Works location: In The Footway Outside Number 26
Works description: Repair Defective Reinstatement
Responsibility for works: United Utilities Water
Current status: Planned work about to start
Stanley Road, Formby, Sefton Council
18 July — 20 July
Delays unlikely Some carriageway incursion
Works location: Opposite Lighting Column 1 Formby Sefton Council
Works description: '100mm (2 Layers Of 50mm), 10mm Ac Close, Bs En13108-01 In Carriageway'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Roadworks Information provided by ELGIN www.elgin.org.uk. Roadworks Information Database Right copyright © ELGIN. Roadworks Information may contain NTCC Traffic Data copyright © Highways Agency. Roadworks Information may contain TfL Transport Data copyright © Transport for London. Roadworks Information may contain Ordnance Survey data and database rights © Crown copyright. Click here for further information on reuse and copyright of Roadworks Information.