Roadwork update for today and tomorrow in Formby and Hightown
Roadworks starting today and tomorrow in Formby and Hightown
North End Lane, Ince Blundell, Sefton Council
26 May — 27 May
Delays possible Some carriageway incursion
Works location: On Bend & On Approach To Bend
Works description: Erect Poles / Chevron Signs
Responsibility for works: Sefton Council
Current status: Planned work about to start
B5424 Liverpool Road, Formby, Sefton Council
26 May — 31 May
Delays unlikely No carriageway incursion
Works location: Outside 1 Gable Mews , 75
Works description: Remedial Reinstatememt In The Footway
Responsibility for works: Virgin Media
Current status: Planned work about to start
B5424 Liverpool Road, Formby, Sefton Council
26 May — 31 May
Delays unlikely No carriageway incursion
Works location: In Footway By The Side Of 99 Liverpool Road, Liverpool Road
Works description: Locate And Excavate 1 Blockage In Existing Duct
Responsibility for works: BT
Current status: Planned work about to start
Birkey Lane, Formby, Sefton Council
27 May — 01 June
Delays unlikely Some carriageway incursion
Works location: Outside 5, 7 Formby Sefton Council
Works description: '100mm (2 Layers Of 50mm), 10mm Ac Close, Bs En13108-01 In Carriageway'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Formby Fields, Formby, Sefton Council
26 May — 31 May
Delays unlikely Some carriageway incursion
Works location: S/O 6
Works description: Self Defect - To Rework 10mm Patch In Carriageway Remedial Works Following Defect Inspection - To Rectify Damage To Footway & Carriageway Abandon 135.3m X 6"Si. Lay 135.3m X 125mm Pe Insertion. All Services Onroute.
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
Ince Crescent, Formby, Sefton Council
27 May — 08 June
Delays unlikely Some carriageway incursion
Works location: Column 9, Outside 33 Formby
Works description: 'Removal Of Electricity Supply From Redundant Street Furniture And The Installation Of Supply To Replacement Street Furniture Including The Excavation And Reinstatement Of The Footway' 'Removal Of 5 - 6 Mtr Column'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Priesthouse Lane, Formby, Sefton Council
27 May — 08 June
Delays unlikely Some carriageway incursion
Works location: Column 7, Outside 18 Formby
Works description: 'Removal Of Electricity Supply From Redundant Street Furniture And The Installation Of Supply To Replacement Street Furniture Including The Excavation And Reinstatement Of The Footway' 'Removal Of 5 - 6 Mtr Column'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Romsey Avenue, Formby, Sefton Council
26 May — 31 May
Delays unlikely Some carriageway incursion
Works location: 8
Works description: Self Defect - To Rework 10mm Patch In Carrigeway Remedial Works Following Defect Inspection - Rework 10mm Patch In Carriageway And Slurry Seal Various Patches In Footway
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
Southport Old Road, Formby, Sefton Council
26 May — 31 May
Delays unlikely Some carriageway incursion
Works location: Length
Works description: Carriageway Reconstruction
Responsibility for works: Sefton Council
Current status: Planned work about to start
Roadworks Information provided by ELGIN www.elgin.org.uk. Roadworks Information Database Right copyright © ELGIN. Roadworks Information may contain NTCC Traffic Data copyright © Highways Agency. Roadworks Information may contain TfL Transport Data copyright © Transport for London. Roadworks Information may contain Ordnance Survey data and database rights © Crown copyright. Click here for further information on reuse and copyright of Roadworks Information.