A565 Formby Bypass, Formby, Sefton Council
16 March — 29 March
Delays likely Lane closure
Works location: Column 60l, Adjacent To Roundabout Formby
Works description: 'Removal Of Electricity Supply From Redundant Street Furniture And The Installation Of Supply To Replacement Street Furniture Including The Excavation And Reinstatement Of The Footway' 'Installation Of 12 Mtr Column' 'Removal Of 12 Mtr Column'
Responsibility for works: Sefton Council
Current status: Planned work about to start
Kings Road, Formby, Sefton Council
15 March — 17 March
Delays likely Road closure
Works location: Junction Of Duke Street Formby Sefton Council
Works description: '100mm (2 Layers Of 50mm), 10mm Ac Close, Bs En13108-01 In Carriageway'
Responsibility for works: Sefton Council
Current status: Planned work about to start
B5424 Ryeground Lane, Formby, Sefton Council
15 March — 17 March
Delays possible Some carriageway incursion
Works location: Lhs From Southport Road
Works description: Footway Patch Rigid
Responsibility for works: Sefton Council
Current status: Planned work about to start
B5195/A565 Altcar Road, Formby, Sefton Council
16 March — 25 March
Delays unlikely No carriageway incursion
Works location: 59
Works description: Excavate To Standard Depth, Open Cut In Footway Jointbays To Install And Lay Cable For Underground Electrical Service Connection. Followed By A Reinstatement.
Responsibility for works: SP Energy Networks
Current status: Planned work about to start
Glenmarsh Way, Formby, Sefton Council
16 March — 25 March
Delays unlikely Traffic control (give & take)
Works location: 27
Works description: Excavate To Standard Depth, Open Cut In Footway And Carriageway Jointbays To Install And Lay Cable For Underground Electrical Service Connection. Followed By A Reinstatement. Linked With Gy002 U180025231 - Altcar Road
Responsibility for works: SP Energy Networks
Current status: Planned work about to start
Squirrel Green, Formby, Sefton Council
15 March — 21 March
Delays unlikely Traffic control (give & take)
Works location: 8 Squirrel Green
Works description: Alter And Relay 9m Domestic Service Of Which 1m Is In The Public Frommain In Footway In Squirrel Green
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
Information aquired from roadworks.org website which states:
ACCURACY AND LIABILITY: The contents of this web site are for information only. Neither Elgin nor primary data providers accept any responsibility for any loss or damage caused as a result of using the information. Neither Elgin nor the primary data providers warrant the accuracy or timeliness of data displayed on this website. The data is displayed without warranty or commitment of any kind, and to the maximum extent permitted by law, any and all representations, warranties or conditions of any kind whatsoever (including express, implied or statutory warranties of merchantability, fitness for a particular purpose, title, non-infringement, accuracy or satisfactory quality), whether dealing with data or otherwise, are expressly excluded.
Commentaires